Will your parking lot pass the light check?
Enter your county, the year the building was built, its use, and your lot. See the rule that applies, the light level it requires, the deadline, who must seal the report, and the likely fix. The map shows where the lot is too dark.
ExampleA 1997 retail center in Miami-Dade with 240 spaces and 12 poles. Two heads are out. Change any value to check your own lot.
Result
Your lot at night
Use the arrow keys to move over the lot and read the light level at each point.
Today and after the fix
The rules we found
We read each rule in the official text. Each card quotes the text and links to it. If a code sets no light level, the card says so.
Signs and storefronts
Owners often fix the sign lights in the same project. LED letters use less power than neon. Some codes limit sign brightness and hours.
Sign light rules, ULDC Art. 8.F.5
Cities and the other counties have their own sign codes. Check yours before you change a digital sign.
Questions and answers
Short answers to common questions. Each answer links to its source.
What light level does a parking lot need in Florida?
Your county or city code sets the light level. We found no statewide level for most parking lots. In Miami-Dade, Code Sec. 8C-3 asks for a maintained minimum of 1.0 fc on retail, office and apartment lots. There, factory and storage lots need 0.5 fc. Fort Lauderdale ULDR Sec. 47-20.14 asks for a 2.0 fc average and a 1.0 fc minimum on nonresidential lots. Unincorporated Palm Beach County asks for a 1.0 fc minimum and a 12.0 fc maximum, except on multifamily lots (ULDC Table 5.E.4.E). Where we find no level, this page uses the Miami-Dade level as a planning target. Check with your local building official.
What is a foot-candle, and how is a lot measured?
A foot-candle (fc) is one lumen of light on one square foot. One fc is about 10.76 lux (NIST conversion table). To check a lot, a light meter reads the light on the pavement at points on a grid. Fort Lauderdale uses a 10 by 10 ft grid. Codes also limit the max-to-min ratio: the light at the brightest point divided by the light at the darkest point. A 12:1 limit lets the brightest point have up to 12 times the light of the darkest point. Miami-Dade and Fort Lauderdale use 12:1. Unincorporated Palm Beach County uses 12:1, or 10:1 on multifamily lots.
Does the Miami-Dade 40-year recertification check the parking lot lights?
Yes. The county requires a certificate that the parking lot lighting meets Code Sec. 8C-3 (county recertification page). For most buildings built in 1993 or later, the first recertification comes at 30 years. It then repeats every 10 years. Condo and co-op buildings of three or more stories, within three miles of the coast and built in 1998 or later, start at 25 years. Older buildings follow the dates on the county page. The report is due 90 days after the county notice. A late report can bring a $510 citation, and penalties can reach $10,000 per violation.
Does the Broward 25-year building safety inspection check parking lot lights?
The Broward Building Safety Inspection Program (BORA Policy 05-05) starts when a building reaches 25 years. Inspections then repeat every 10 years. A Florida licensed engineer or architect inspects the structure and the electrical system, then signs and seals the report. The policy text sets no light level for parking lots. Some cities set one in their own codes, such as Fort Lauderdale ULDR Sec. 47-20.14. Ask your city building department which rule applies and when your report is due.
Who signs and seals the lighting report or the photometric plan?
It depends on the place. In Miami-Dade, a Florida registered engineer or architect measures the lot. That person signs and seals the parking lot certificate, which records the maximum, the minimum and the max-to-min ratio. In unincorporated Palm Beach County, a building permit application for outdoor lights needs a photometric plan. A licensed engineer, architect or landscape architect signs and seals it (ULDC Art. 5.E.4.E). A sealed certificate of compliance is due before the certificate of occupancy. Elsewhere, ask your local building official.
Can we dim the lot lights after closing?
In Miami-Dade, most nonresidential lots can. Sec. 8C-3 lets retail, office, factory and storage lots drop the light level by 50% on non-business days. They can also drop it from 30 minutes after closing. Hotel and apartment lots (Groups R1 and R2) get no such reduction. In unincorporated Palm Beach County, parking lot lights must go off by 11:00 p.m. or one hour after active use ends, whichever is later. Security lights are the exception. Required security lights must keep a 0.75 fc average and a 0.3 fc minimum from dusk to dawn. Lots there also need a photocell or an astronomical time clock (ULDC Art. 5.E.4.E). The check on this page uses the full light level.
Will new LED heads on our old poles pass?
It depends on the pole spacing, the mounting height and the LED optic. The check above puts LED heads on your poles one for one and tries each size from small to large. If no size passes, it adds poles at the darkest spots. In a U.S. Department of Energy study of a shopping center lot, 25 LED heads replaced 28 high pressure sodium and metal halide heads. The darkest point rose from 0.60 to 1.03 fc, and the average fell from 3.81 to 2.03 fc. The study estimated 58% energy savings. A photometric study with the maker's IES files confirms the final design.
Do convenience stores have their own rule?
Yes. Florida Statutes 812.173 requires a parking lot lit to at least 2 foot-candles per square foot at 18 inches above the surface. The rule covers a "convenience business" (F.S. 812.171). This is a store that sells mainly groceries, or groceries and gasoline. It is open at some time between 11 p.m. and 5 a.m. It also holds a license from the Division of Alcoholic Beverages and Tobacco. The law excludes restaurants, stores with at least 10,000 sq ft of retail floor space, and some other stores. After a state notice, the owner has 30 days to show compliance. A continued violation can bring a civil fine of up to $5,000 (F.S. 812.175).
Send to a lighting pro
What happens next
- Copy the brief. Nothing is sent from this page.
- Paste it into an email to the lighting pro or the engineer who does your report.
- A Florida engineer or architect measures the lot at night and seals the report where the rule needs it.
A Lighting Certified (LC) designer reviews South Florida projects (Palm Beach, Broward and Miami-Dade). A partner reviews projects in other areas.
How the check works
We find the rule for your county, city and use. We read the light level from the code text: minimum, average, maximum and the ratios.
We draw a lot with 9 by 18 ft stalls and 24 ft aisles that holds your spaces. Poles stand on the curbs and the islands between rows.
We add the light from every head at points about 5 ft apart. We use the lumens of each fixture type and a light loss for age and dirt.
We put LED heads on the same poles and try each size from small to large. If no size passes, we add poles at the darkest spots.
Notes for the owner
These notes are for the site owner. They are hidden from customers by default.
Sources
Our assumptions
Engine limits
Corrections to earlier notes
Ask a lighting designer about this project
Send your plan to Holzer Lighting in Boca Raton, Florida. Holzer Lighting designs, specifies and buys lighting for owners, managers, designers and builders.
A designer reads your brief and contacts you. The designer checks the rules, the light levels and the prices for your site. This page gives planning estimates only.
You can also email info@holzerlighting.com or call 561.508.8990.
Other free lighting tools: